Architectural Drawings for Building Control Approval

info574228
Sep 21
7 min read

Table of Contents

  • What Building Control Approval Actually Involves

    • The Full Plans Application Process

    • When You Need Building Regulations Approval

  • The Difference Between Planning and Building Regs Drawings

  • What Must Be Included in Your Building Control Submission

    • Compliance with Approved Documents

  • Structural Calculations for Building Regulations

  • The Cost of Building Control Drawings and Fees

    • Statutory Fees

    • Design Fees

    • What Drives the Price Up

  • How to Prepare for a Building Control Site Inspection

    • The Notification Process

    • Key Inspection Stages

    • What the Surveyor Will Want to See

    • Consequences of Missed Inspections

    • Post-Approval Amendments

    • Digital Submission and Record-Keeping

  • Common Reasons Applications Get Rejected (and How to Avoid Them)

  • Frequently Asked Questions

Last Updated: September 20, 2026

What Building Control Approval Actually Involves

Building control approval is the formal sign-off that your construction work meets the minimum standards set out in the Building Regulations. It is separate from planning permission, and you need it for most structural work. This guide from Sd Architecture explains exactly what architectural drawings for building control approval must contain.

Architect and client reviewing architectural drawings for building control approval on a studio desk.

The Full Plans Application Process

The full plans application is the most common route for extensions and loft conversions. You submit detailed drawings before work starts, and the building control body checks them in advance.

The steps look like this:

  1. Prepare your technical drawings and construction details

  2. Submit the building control submission with the correct statutory fees

  3. A building control surveyor reviews the plans

  4. You receive approval, sometimes with conditions

  5. Book site inspections at key stages

  6. Collect your completion certificate at the end

When You Need Building Regulations Approval

Most significant residential work needs approval. Common triggers include:

  • Extensions and loft conversions

  • Structural alterations, such as removing a load-bearing wall

  • New foundations or changes to drainage plans

  • Replacing windows and doors

  • Electrical and plumbing work in certain zones

Small jobs like minor repairs or like-for-like replacements usually fall outside the scope. When in doubt, check with your building control body before you start.

The Difference Between Planning and Building Regs Drawings

Planning drawings and building regs drawings serve two different purposes, and confusing them is one of the most common mistakes we see. Planning drawings show what the project looks like and how it sits on the plot. Building regs drawings show how it will actually be built.

Planning sets focus on:

  • Appearance and materials

  • Scale, height, and position

  • Impact on neighbours and the street

Building regs sets focus on:

  • Structural integrity

  • Thermal performance and insulation standards

  • Fire safety and ventilation requirements

  • Damp proofing and drainage

Watch Out Submitting planning drawings as your building control submission will get your application rejected. Building control needs cross-sections, construction details, and specifications that planning drawings simply do not include.

What Must Be Included in Your Building Control Submission

A complete submission needs a specific set of technical drawings. Missing any of these is a fast route to delays.

Your pack should include:

  • Floor plans for every level

  • Elevation drawings showing all sides

  • Cross-sections through walls, floors, and roofs

  • Site and drainage plans

  • Structural calculations where needed

  • Building regs notes explaining how each part complies

Compliance with Approved Documents

Approved Documents are the government's official guidance on meeting the Building Regulations. Each one covers a different area, from structure to fire safety to energy efficiency.

Pro Tip Reference the specific Approved Document letter and clause next to each relevant detail on your drawings. Building control surveyors approve faster when they can see compliance at a glance rather than hunting for it.

Structural Calculations for Building Regulations

Structural calculations prove your design can carry the loads it will face. They are required whenever you alter the structure of a building.

Typical triggers include:

  • Removing or altering load-bearing walls

  • New beam calculations for openings

  • Loft conversions adding weight to existing joists

  • New foundations for extensions

The Cost of Building Control Drawings and Fees

Two separate costs apply to any building control submission, and homeowners routinely confuse them:

  • Design fees paid to your architect or drawing service for producing the building regs drawings

  • Statutory fees paid to the building control body for checking the application and carrying out inspections

Statutory Fees

Statutory fees are not negotiable and are set by each building control body. For a full plans application, most local authorities charge on a sliding scale based on the estimated cost of the work, with separate amounts for the plan-check stage and the inspection stage. As a broad guide, a domestic extension or loft conversion typically attracts a plan-check fee in the low hundreds of pounds and an inspection fee of a similar order, so the combined statutory charge often lands somewhere between roughly £400 and £1,200 for a straightforward residential project.

Design Fees

Design fees for building regs drawings depend on:

  • The size and complexity of the project

  • Whether structural calculations are needed (these are often charged separately by the engineer)

  • The number of revisions required

  • Whether planning drawings already exist that can be developed into building regs drawings

Design fees for building regulations drawings vary. Structural calculations are usually quoted separately.

What Drives the Price Up

  • Tricky ground conditions requiring specialist foundation design

  • Multiple structural openings or load-bearing alterations

  • Complex drainage or party wall considerations

  • Heritage or conservation area constraints

  • Multiple revision rounds caused by incomplete briefs

Key Takeaway Ask for a full breakdown of both design fees and statutory fees upfront. The two are separate, and homeowners are often surprised by the building control charge when it lands. A written fee quote from the building control body should be requested before you submit. Find your local authority building control body How to Prepare for a Building Control Site Inspection A site inspection confirms that the work on site matches your approved drawings and complies with the Building Regulations. The building control surveyor visits at set stages, not just once at the end. Understanding what happens at each stage, and how to notify the body, is what separates a smooth build from a stalled one. The Notification Process You or your builder must give the building control body reasonable notice before each inspection stage. Most bodies ask for at least 24 to 48 hours' notice, and some prefer longer for the initial foundation visit. Notification is usually done by phone, email, or through the body's online portal. If you are using an approved inspector, they will often agree a schedule of visits with you at the outset. Key Inspection Stages Commencement, notify the body before work starts so the first inspection can be scheduled Foundations, inspected after excavation and before concrete is poured, including the depth, width, and reinforcement Damp proof course, checked before it is covered by subsequent construction Drainage, inspected after laying and before backfilling, including falls, connections, and access points Structural work, beams, lintels, and load-bearing elements checked before they are enclosed Insulation and thermal elements, verified before plastering or drylining Roof structure, inspected before covering, including ventilation and fire-stopping Final inspection, carried out before the completion certificate is issued What the Surveyor Will Want to See A copy of the approved drawings on site Structural calculations where relevant Evidence of compliance for windows, electrical work, and other certified elements Safe access to the areas being inspected Consequences of Missed Inspections If a stage is covered before it is inspected, the building control body may require you to open up the work so it can be checked. This can mean removing plaster, lifting floors, or exposing foundations, all of which add cost and delay. In some cases, the body may refuse to issue a completion certificate until the work is verified, which can affect the sale of the property. Never cover up work before it has been inspected. The cost of opening up finished work is far higher than the cost of a scheduled visit. Post-Approval Amendments If you need to change the design after approval has been granted, do not quietly alter the work on site. Submit a revised drawing to your building control body and get it signed off first. Silent changes can void your approval and, with it, your completion certificate. Most bodies will accept minor amendments by email, but significant changes may require a formal re-submission and an additional fee. Digital Submission and Record-Keeping Most building control bodies now accept digital submission through online portals. Uploading clear PDFs is faster than paper and easier to track. Keep a record of all submissions, approvals, and inspection reports in one place, you will need them if you come to sell the property. Common Reasons Applications Get Rejected (and How to Avoid Them) Problem Why It Fails The Fix Missing cross-sections Surveyor cannot check construction Add full sections through walls and floors No structural calculations Structural integrity unproven Commission an engineer early Vague material specs Cannot confirm compliance State exact materials and U-values Poor drainage detail Drainage plans incomplete Include full site drainage layout Wrong drawing type Planning drawings submitted Produce dedicated building regs drawings Never start work before you have approval in principle. If you build first and apply later, you risk having to undo finished work to meet the regulations. The cost of that mistake dwarfs the fee you were trying to avoid.

For post-approval amendments, do not quietly change the design on site. Submit a revised drawing to your building control body and get it signed off first. Silent changes void your approval and can void your completion certificate with it.

Frequently Asked Questions

Do I need an architect to produce drawings for building control?

You are not legally required to use an architect. However, building control drawings must include construction details, technical specifications, and compliance notes that meet statutory requirements. A homeowner can technically submit their own, but errors in structural calculations, thermal performance data, or drainage plans often lead to rejection. For extensions and loft conversions, most people use an architectural designer or technician to ensure the drawings satisfy the building control body first time.

What is the difference between planning permission drawings and building regulation drawings?

Planning permission drawings show how your project looks externally and how it affects neighbours and the local area. Building regulation drawings are far more technical. They show construction details, insulation standards, ventilation requirements, fire safety, and structural integrity. You need planning approval before you start, but building control approval confirms the work meets current safety and energy standards. The two sets of drawings serve completely different purposes and are assessed by different bodies.

How much do building control drawings cost?

The cost of building control drawings depends on the size and complexity of your project, the level of structural calculations required, and whether you need drainage plans or party wall agreements. Statutory fees for the building control body are separate from design fees. SD Architecture can provide a clear breakdown of all costs upfront, including structural engineering fees, so there are no surprises halfway through your project.

What happens if my building control drawings are rejected?

If your building control submission is rejected, the building control officer will list the specific issues, often relating to missing construction details, inadequate insulation specifications, or incomplete structural calculations. You can amend and resubmit without starting over. Common rejection reasons include missing cross-sections, unclear beam calculations, and non-compliant damp proofing details. Working with an experienced designer who understands Approved Documents significantly reduces the risk of rejection.