What Should an Architect Contract Include?
Last Updated: November 1, 2026
Quick Summary
An architect contract should include the scope of services, fees and payment schedule, deliverables and milestones, copyright and ownership of drawings, consultant arrangements, insurance and liability, and terms for changes, termination and disputes. Check every blank in the standard form and confirm the fee proposal matches the agreement before you sign.
Basic services usually cover survey, concept design, planning and building regulations drawings, but site visits often cost extra.
Never pay the full fee upfront; tie stage payments to milestones rather than dates.
The architect normally keeps copyright and grants you a licence to use the drawings for that project.
A change in scope should need written authorisation, such as a signed one-page change note, before work continues.
Ask for the professional indemnity certificate and confirm the limit matches the contract.
Table of Contents
Start With a Practical Architect Contract Checklist
Knowing what to include in an architect contract is the difference between a smooth build and a costly argument. For a broader guide to hiring an architect for residential renovations, read our full walkthrough of the process.

Most architects use a standard form agreement based on a recognised industry template. That is fine, but a template still needs checking, because the blanks are where the risk sits.
Here is a checklist to run through before any signature:
Names and addresses of both parties, clearly stated
The exact scope of services, in writing
What counts as basic services and what costs extra
Watch out: the biggest mistake is treating the contract as paperwork to sign at the end. Read it before you pay a deposit. Once money changes hands, your negotiating position weakens.
Match the Architect Agreement Scope of Services to Your Project
The scope of services is the heart of the architect agreement. It defines exactly what the architect will do, and by omission, what they will not.
Basic services usually cover the core work: measured survey, concept design, planning application drawings, building regulations drawings and some construction information. Additional services sit outside that and cost more. These often include:
Structural engineering coordination
Party wall advice
Interior design
A common mistake is assuming site visits are included. Some homeowners discover halfway through the build that nobody is checking the work on their behalf.
What drives architectural cost is project complexity, site constraints and the level of service you choose. Our guide to factors affecting architectural costs in Hampshire explains each in more detail.
Set Out Architect Fees and Payment Schedule in Plain Terms
Architect fees usually follow one of four models, each carrying a different risk. The model matters less than whether the contract explains how the total changes when the project changes, and almost none do.
Fixed fee: a set amount for a defined scope. Best when the project is clear and unlikely to change.
Percentage fee: a share of the construction cost, often used on larger or evolving projects.
Hourly rate: charged for time spent, typically on small jobs or additional services. Flexible but open-ended.
Retainer: a monthly or staged payment for an ongoing service, often used where the architect is involved over a long period or across multiple work stages.
Worked example: how a change affects the total
Suppose a fixed fee of £8,000 covers stages 1 to 4 (survey through building regulations drawings). Halfway through stage 3 you ask for a second planning application after a refusal. The contract should say whether that is additional work, at what rate, and whether the fixed fee for the remaining stages is reduced because the original planning submission is no longer the deliverable.
Payment schedule
The fee structure matters less than the payment schedule. Ask for a clear breakdown by stage, with amounts tied to milestones rather than dates. Never pay the full fee upfront. Ask for a deposit that is clearly stated in the contract, with the balance released as each stage is signed off. Check what happens to fees already paid if you terminate mid-stage, see the termination section below.
Reimbursable expenses
Expenses are separate from fees. Reimbursable costs might include printing, travel, planning application charges and consultant fees. Ask for these to be itemised and approved in writing before they are incurred, and ask whether the architect adds a handling charge. Planning application fees are set by the local authority and are normally passed through at cost.
Budget overruns and cost-estimate limitations
This is the clause most homeowners misread. An architect can design to a budget, but cannot guarantee contractors will build it for that figure. Construction costs depend on market conditions, tender returns and site conditions the architect cannot control. The contract should state:
Whether the architect is providing a cost estimate, a cost plan, or a statement of probable cost, and what each means
What happens if tenders come in above the agreed budget: does the architect revise the design at no extra fee, or is that additional work?
Whether a quantity surveyor is appointed, and by whom
If the contract is silent on these points, ask for them to be added before you sign.
Pricing depends on the scope, complexity and stage of your project, so we do not quote figures here. For concrete benchmarks, see our guide to architectural fees for residential extensions.
Here is how the four common fee models compare on certainty and risk.
Fee model | How it works | Best for | Key risk |
Fixed fee | Set amount for a defined scope | Clear projects unlikely to change | Extra work often billed hourly |
Percentage fee | Share of construction cost, often sliding scale | Larger or evolving projects | You pay more if costs rise |
Hourly rate | Charged for time spent | Small jobs or additional services | Open-ended |
Retainer | Monthly or staged payment for ongoing service | Long or multi-stage involvement | Extra billing triggers |
Clarify Architect Drawings Copyright and Ownership Before You Sign
Ownership of documents is the clause most homeowners skip, and it bites hardest. Under standard practice, the architect keeps copyright in the drawings and designs.
That distinction matters. If you want to use the same drawings for a different site, or hand them to another architect, you may need permission. Read the licence carefully. Check whether it covers:
Building the project as designed
Sharing drawings with contractors and building control
Reusing designs on another property
Digital files, BIM models and CAD documents add another layer.
If you plan to submit drawings for approval, understand how they will be used. Our article on architectural drawings for building control approval explains what that process involves.
Agree Deliverables, Milestones and Project Schedule
Deliverables are the tangible outputs you pay for, and the schedule is when you get them. Both need to be specific.
A weak contract says "drawings as required". A strong one lists each deliverable and the stage it belongs to. Typical deliverables include:
Measured survey drawings
Concept sketches and options
Planning application package
Building regulations drawings
Construction documents and specifications
Tender and construction information
Milestones should tie to deliverables, not calendar dates alone. "Planning submission by March" is weaker than "planning submission within two weeks of design sign-off". The second gives both sides a clear trigger.
Understand how milestones are managed before you sign, and judge whether the contract's schedule is realistic. Our guide to architectural project management for homeowners covers how milestones and schedules are handled in practice.
Cover Consultants, Insurance and Professional Liability
Your architect rarely works alone. Structural engineers, party wall surveyors and other consultants are often needed, and the contract should say who appoints them and who pays.
Two arrangements are common. The architect appoints consultants as subconsultants under their own agreement, or you appoint them directly. Direct appointment gives you control but more admin.
Professional liability and insurance are non-negotiable. Ask for:
Professional indemnity insurance, with the level stated
Public liability cover
The indemnity clause, explained in plain words
Insurance limits and risk allocation are where contracts get technical. A reputable architect will explain what their cover does and does not include.
Plan for Changes, Termination and Dispute Resolution
Projects change. The contract should define how, at what cost, and in what form. This section also covers the practical workflow for negotiating the agreement before you sign, the step most homeowners skip and most guides ignore.
Changes to scope
A change in scope should require written authorisation before work continues. Verbal instructions are a trap. If the architect does extra work on a handshake, you may still be billed.
Watch for the difference between a change and a clarification. Moving a door is a change; confirming a door size already shown on the drawings is not. If the contract does not distinguish them, every conversation becomes a potential invoice.
Termination and suspension
Termination and suspension clauses protect both sides. Check:
Your right to terminate, and the notice period, commonly 14 or 30 days in writing
What you owe if you terminate mid-stage: fees for work done to date, plus any expenses already committed, and whether a termination fee applies
The architect's right to suspend work for non-payment, and how much notice they must give
A common pattern is that the architect retains copyright but grants a licence to use the drawings for the project, even after termination, provided fees are paid. Check that the licence survives termination and covers the stages you have paid for.
Dispute resolution
Dispute resolution should set out the steps before anyone reaches for a solicitor. Many contracts require negotiation or mediation first. Check whether the contract names a specific mediation provider or simply says "mediation", and whether mediation costs are shared.
One clause worth flagging: fitness for purpose. Architects generally owe a duty of reasonable skill and care, not a guarantee the building will be perfect (The Do’s and Don’ts when reviewing your contracts). Understand the difference before you sign.
Practical signing and negotiation workflow
Before you sign, run this sequence:
Compare the proposal with the agreement. The fee proposal and the contract should match on scope, stages and fee. If the proposal says "includes site visits" and the contract does not, the contract wins.
List every blank. Standard forms have blanks for names, dates, fee amounts, notice periods and insurance limits. A blank left unfilled is a term you have not agreed. Ask for each one to be completed or struck through.
Mark up the draft. Send the architect a written list of requested changes, with clause numbers. Verbal assurances are not amendments.
Agree amendments in writing. Confirm accepted changes by email or in a signed addendum before signing the main agreement. Keep the addendum with the contract.
Check the insurance certificates. Ask for the professional indemnity certificate and confirm the limit and policy period match what the contract states.
Sign and date every page. Initial any handwritten changes. Keep a complete copy, including the addendum and any change notes.
Pro Tip If the architect will not amend a clause, ask them to explain in writing why not. A refusal to explain is a warning sign; a reasoned explanation is often a fair point you had not considered.
Watch Out Do not sign a contract that refers to a separate "schedule of services" you have not seen. The schedule is where the scope and fee usually live, and it is the document most often left out of the pack.
Book a Contract Review With SD Architecture
Getting the contract right takes careful reading. If you are planning an extension, loft conversion or self-build, please contact SD Architecture to discuss your project.
SD Architecture provides support from initial concepts and planning permissions through to building regulations and turn-key project delivery.
Frequently Asked Questions
What should be included in an architect's contract?
A complete architect contract names the parties and the property, then sets out the scope of services, deliverables and project schedule. It should state the architect's fee, how and when it is paid, and which expenses are reimbursable. Include clauses on copyright and licence to use drawings, professional liability insurance, changes in scope, termination and dispute resolution. A written architect contract checklist helps you confirm every clause is present before you sign.
What should I check before signing an architect's agreement?
Read the scope of services first and confirm the stages covered, from concept through to construction administration. Check the fee basis and payment schedule, and ask which expenses are additional. Confirm who owns the drawings and what licence you receive, and check insurance limits. Make sure changes, suspension and termination are covered, and that the governing law and dispute process are stated. If anything is unclear, ask for it in writing before signing.
How are changes to the design or project handled in an architect's contract?
A well-drafted contract defines what counts as a change in scope and requires written authorization before additional work begins. It should state the hourly rate or method used to price extra services, and how changes affect the project schedule. Keep a written record of every instruction and variation so there is no dispute later. If you request a redesign after planning approval, expect it to be treated as an additional service with its own fee.
Does an architect's contract cover copyright and use of drawings?
The architect usually retains copyright in the drawings and specifications, while the client receives a licence to use them for the specific project. The contract should state the scope of that licence, whether it transfers on full payment, and what happens if the project does not proceed. It should also cover digital files and BIM models. Check these terms before signing so you know what you can reuse and what requires the architect's permission.
A well-drafted architect contract protects your budget, your timeline and your drawings. If you would rather not navigate the clauses alone, our team can help. Get started with Sd Architecture and move from signed agreement to shovels in the ground with fewer surprises.